Site & Installation Review
Confirm room dimensions, load and utility assumptions, service clearances, delivery path, network needs, and installation acceptance criteria before equipment arrives.

From room survey to lifecycle record
Structure the handoffs around installation, representative-user training, preventive maintenance, reprocessing compatibility, and decommissioning.
Three service workstreams
Confirm room dimensions, load and utility assumptions, service clearances, delivery path, network needs, and installation acceptance criteria before equipment arrives.
Walk representative users through setup, chair positioning, turnover, cleaning, alarm or status indicators, shutdown, and escalation using the current IFU.
Define preventive-maintenance intervals, calibration where applicable, field action contacts, parts planning, software revision controls, and end-of-life data handling.
Five controlled handoffs
Capture dimensions, access, utilities, suction, air, electrical load, network, cabinetry, cleaning zone, and local installation constraints.
Verify reference identity, delivered accessories, utility connection, mechanical movement, safety checks, configuration record, and acceptance signatures.
Test setup, normal use, foreseeable misuse, emergency stop, daily care, and handoff to reprocessing with users from each role.
Record service intervals, replacement parts, software or firmware revisions, electromagnetic compatibility (EMC) considerations, and complaint routes.
Address protected-data removal where applicable, accessory disposition, UDI and asset records, reusable material route, and final service documentation.
These are workflow commitments for the review process, not uptime, outcome, or response-time claims for a specific service contract.
Scope a service review
Include current models, target references, procedure mix, reprocessing method, open service issues, and the destination market. BTL can route the request without assuming that one support plan fits every product.